ALREWAS VILLAGE HALL 6-8-2015. ON THE FINAL STRAIGHT. PHIL, COLIN AND JIM ON RENDERING, CHUMMY, ARRON ON HAND RAIL, MARTYN AND GARETH (SPARKING), PAUL AND JAMES ON LEAD AND CAPPING, GRAHAM (KENDO) CARPENTER ON THE GATE, HENRY ON FLOORING. IAN AND RICHARD (KIRKLAND) DROPPING IN . ALL GOOD FOLKS !
ALREWAS VILLAGE HALL W/E 01-08-2015. EXTERNAL TAKING SHAPE , CHUM , KEVIN AND JAMES REMOVING OLD STUCCO , PHIL AND THE LADS WILL MAKE A SUPERB FINISH TO MATCH THE ANNEXE . ARRON AND GRAHAM SORTING SIDE DOOR AND KITCHEN . MARTYN AND GARETH IN THE ROOF SPACE AND UNDER THE FLOOR RUNNING CABLES .ITS GOOD TO SEE IAN OUT AND ABOUT.
ALREWAS VILLAGE HALL W/ENDING 25-07-2015. ROOF INSULATED, OLD FENCE PANELS AND POSTS BEING REPLACED, COLIN AND JIM PLASTER PATCHING, PHIL FINISHING THE TILIING, JAMES, CHUM AND KEITH PREPARING THE FRONT FOR RENDERING. ALL PUSHING ON , FINISH GETTING CLOSER.
ALREWAS VILLAGE HALL 08-07-2015 . EVERYTHING GOING WELL ,THE END IS IN SIGHT. CHUM AND KEVIN NEARLY FINISHED THE PAVING, LOUIS AND TOM ON THE STAIRCASE AND CHAIR STORES , PETE AND GRAHAM ON THE KITCHEN, HAPPY DAYS.
ALREWAS VILLAGE HALL 04-07-2015 . ALL TRADES WELL ON AND THE END IS IN SIGHT . AMAZING HOW HAVING THE RIGHT PEOPLE WORKING TOGETHER CAN BRING AN EXTENSION OF THIS MAGNITUDE AND QUALITY TO A CONCLUSION IN SUCH A SHORT PERIOD . WELL DONE RJK.
ALREWAS VILLAGE HALL WEEK ENDING 27-06-2015 . CHUM WELL ON WITH SLABS AND PAUL AND JAMES LAYING BLOCKS ON THE RAMP , SPARKS FITTING FUSE BOARD , PETE AND GRAHAM FITTING DOOR FURNITURE .ROOF SEALED ON CHAIR STORES AND PLASTERERS FINISHING MAIN HALL . ALL GOOD . ALSO IAN MAKING GOOD RECOVERY .
ALREWAS VILLAGE HALL WEEK ENDING 13-06-2015 .VINYL FLOOR LAID ,CARPET TILES ON STAIRS TO BE FITTED LATER. GRAHAM PUT THE ROOF ON THE CHAIR STORES ALSO HANGING ASH FINISHED DOORS ,ARRON IS FITTING SANITARY WARE ,BRICKIES WELL ON WITH RAMP .SPARKES SECOND FIXING. LOIS PUTTING COLOURS ON WALLS . ALL GOOD .
WEEK ENDING 06-06-2015 . HENRY AND WILL WELL ON WITH VINYL FLOORING , ENTRANCE DOOR FITTED AND LOOKING GOOD , SERVICES ALL LAID AND THE ENTRANCE RAMP BEING PREPARED . KEVIN, PAUL AND JAMES ON THE CHAIR STORES BRICKWORK . TOILET PARTITIONS BEING FITTED . ALL GOOD.
WEEK ENDING 30-05-2015 . ANOTHER GOOD WEEK, RAY AND MARK DOING THE GROUNDWORK FOR CHUM AND JAMES ON THE CHAIR STORES ALSO DIGGING OUT AND LAYING SOIL PIPE TO MAINS . SHEET FLOORING LADS WELL ON AND WE'RE GETTING SOME COLOUR ON THE WALLS .PLASTERER,PLUMBER AND CARPENTER MOVING THINGS ON IN THE BACKGROUND . ALL HAPPENING SO QUICK, BLINK AND YOU'VE MISSED IT .
WEEK ENDING 23-05-2015 . MOST TRADES IN THIS WEEK . RAY, MARK AND KEVIN STARTED ON THE CHAIR STOREROOM , DECORATORS IN AND SPARKS FITTING LIGHTS AND SWITCHES , OUR LOCAL BRICKIE CHUM AND JAMES KNOCKED THROUGH THE OPENING FOR THE PROJECTOR . ALL HAPPENING .
WEEK ENDING 16-05-2015 . MAINLY PLASTERERS THIS WEEK , PHIL AND HIS LADS SHOULD BE IN THE MAIN HALL NEXT WEEK . PETE AND JOHN STARTED FIXING ARCHITRAVE AND SKIRTING PLUS THE NEW STAIRCASE WINDOW BEFORE THE OLD ONE FELL OUT ! MARTYN THE SPARKS ALSO GETTING TO GRIPS WITH THE CABLES. PLUMBERS WILL BE SORTING THE SANITARY WARE AND HEATING SOON . ALL GOOD .
WEEK ENDING 09-05-2015 . PLASTERERS PHIL , JIM AND COLIN HAVE DONE US PROUD , WELL ON WITH THE JOB . WE'LL HAVE OTHER TRADES QUEUING TO GET IN AND START SECOND FIXING VERY SOON .
WEEKENDING 02-05-2015 .FELTERS MARTIN AND SONS ( BILLY AND JACK ) FINISHED THE ROOF AND THE PLASTERERS ARE WELL ON WITH THE BOARDING AND STARTED SKIMMING , A GOOD BREAK THIS WEEKEND WILL BE GOOD FOR ALL.
WEEK ENDING 25-04-2015 . ALL TRADES ON FORM , WINDOWS IN , FIRST FIX PIPEWORK AND CABLES READY FOR THE PLASTERERS ON MONDAY. AMAZING WHAT'S BEEN ACHIEVED . RJK AND QUALITY TRADES .
WEEK ENDING 11-04-2015 . ANOTHER RAIN FREE WEEK ALLOWING THE FELTERS TO WEATHERPROOF THE ROOF, NOW THE SPARKS AND CHIPPIES CAN PREPARE FOR THE PLASTERERS. ALL GOOD . HAPPY DAYS .
WEEK ENDING 4-04-2015 . GREAT WEEK ,WET AT TIMES, GOOD PROGRESS.ROOF READY FOR FINISHING (tues ? ) AND STUDDING INSIDE. SLATE COLOURED FACIA AND RED CEDAR SOFFIT GIVES A TASTE OF WHATS TO COME.
WEEK ENDING 28-03-2015. WEATHER'S BEEN KIND AGAIN. BRICKLAYERS WELL ON AND CARPENTERS ON SITE . ALL GOOD ! !
WEEK 8/14-03-2015 . Many hands make light work . Rain put the brakes on on Friday . A dry week next week for the bricklayers would be nice .
WEEK ENDING 7-3-2015 . STEADY PROGRESS AND THE WEATHER'S HOLDING , ROLL ON NEXT WEEK.
22/28-02-2015
A lovely day and on with the roof! Looks like they're having fun!
|
|
February 15th & 16th
Work continues on the roof. The chaps were in on Sunday which is a good job as rain stopped play for a few hours on Monday morning.
|
|
Friday February 13th
Amazing progress on the roof considering it was only started on Thursday. Great stuff guys! We have been so lucky with the weather, especially for this part of the project.
Thanks to John Brown for keeping up with the filming, it's a wonderful record of this historic renovation of the village hall.
Thanks to John Brown for keeping up with the filming, it's a wonderful record of this historic renovation of the village hall.
|
|
Thursday February 12th
Amazing progress, the roof has been stripped down, insulated and is now being put back together! Great work lads!
|
|
Wednesday February 11th
All of the scaffold is now up and work will soon start on the roof. The slab for the annex is 99.9% done with just the last few infill blocks to go in. The time lapse camera was set up at about 8:10am this morning and turned off at 2.30pm.
|
|
February 9th & 10th
The rest of the slab has been laid and will be coated in screed when the roof is done. Work has now begun on the scaffolding so that work can begin on the roof.
|
|
February 5th & 6th
The annexe floor is now all laid, drains are in and the annexe slab is ready for walls! But they can wait, the next job is the roof.
|
|
February 2nd to 4th
A very long RSJ has now been laced in the old foyer area (more on this next time) and work has begun to lay the concrete floor for the new annexe.
|
|
During Renovation
Wednesday 28th & Thursday 29th January
Amazing progress in around a week and a half. The concrete in the footings has set and the bricklayers have moved in to start laying blocks. Work too has started on the supporting wall for the new kitchen.
|
|
Tuesday 27th January
Bright (or rather dull) and early this morning two lorries arrived with several cubic metres of concrete for the annexe footings.
|
|
Monday 26th 2015
Footings have been dug for the new annexe area which will include a new toilet complex and additional flexible space.
The very soft sand underneath the old extension was clearly responsible for the footing slipping causing the cracks in the walls.
The very soft sand underneath the old extension was clearly responsible for the footing slipping causing the cracks in the walls.
|
|
Friday January 23rd 2015
Lorries arrived to remove the debris from the demolition. Footings dug for the new family toilet block.
|
|
Thursday January 22nd 2015
Tarmac cleared to make way for the footings to be dug for the new annexe. More work on stripping back the old foyer area.
|
Wednesday January 21st 2015
The rest of the 1975s extension was taken down and the foyer area stripped ready for remodelling.
|
Tuesday January 19th 2015
Work has begun in earnest on preparing the inside of the kitchen and foyer area for the demolition stage.
The first part of the demolition process began with the taking down of the front outer wall of the store room.
Work has begun in earnest on preparing the inside of the kitchen and foyer area for the demolition stage.
The first part of the demolition process began with the taking down of the front outer wall of the store room.
|
|